ACO
Spill Containment Curbs
ACO References Register
Education
Home         

Polymer concrete curb units designed to provide safety feature.

  • Can be driven over by slow moving forklift traffic
  • Can be retrofitted
  • Can be glued to floor with correct adhesive
  • Available in Polyester or Vinyl ester polymer concrete for varying chemical resistance

Spill Containments Curbs Product Data

Description
 
Part No.
 
Height
Width
Length
Weight
 
 
inches
mm
 
inches
mm
 
inches
mm
 
lbs

Spill Containmnent curbing - polyester polymer concrete
2.4" high curbing  
05730
 
2.4"
60
 
11.4"
290
 
39.37"
1000
 
54.0
4.0" high curbing  
05731
 
4.4"
100
 
23.6
600
 
39.37"
1000
 
175.0

Spill Containment Curbing - Vinyl ester polymer concrete
2.4" high curbing  
05733
 
2.4"
60
 
11.4"
290
 
39.37"
1000
 
54.0
4.0" high curbing  
05734
 
4.4"
100
 
23.6"
600
 
39.37"
1000
 
175.0

Spill Containment Capacities


Gallon contained based on Type - I (2.3" high) curbs

Gallon contain based on Type - II (4.0" high) curbs
Feet

5

10

15

20

25

30

35

40

45

50

5

36

 

 

 

 

 

 

 

 

 

10

72

143

 

 

 

 

 

 

 

 

15

108

215

323

 

 

 

 

 

 

 

20

143

287

430

574

 

 

 

 

 

 

25

179

358

538

717

896

 

 

 

 

 

30

215

430

645

860

1075

1290

 

 

 

 

35

251

502

753

1004

1255

1506

1756

 

 

 

40

387

574

860

1147

1434

1721

2007

2294

 

 

45

323

645

968

1290

1613

1936

2258

2581

2904

 

50

358

717

1075

1434

1792

2151

2509

2868

3226

3585

Feet

5

10

15

20

25

30

35

40

45

50

5

62

 

 

 

 

 

 

 

 

 

10

125

249

 

 

 

 

 

 

 

 

15

187

374

561

 

 

 

 

 

 

 

20

249

499

748

997

 

 

 

 

 

 

25

312

623

935

1247

1559

 

 

 

 

 

30

374

748

1122

1496

1870

2244

 

 

 

 

35

436

873

1309

1746

2182

2618

3055

 

 

 

40

499

997

1496

1995

2494

2992

3491

3990

 

 

45

561

1122

1683

2244

2805

3366

3928

4489

5050

 

50

623

1247

1870

2494

3117

3741

4364

4987

5611

6234


INSTALLATION


1. Locate and install all trench drains and sub floor plumbing prior to setting spill curbing in place.

2. Spill curbs must be cleaned before installing. Use a diamond blade grinder or similar grinding tool to remove (1/32” - 1/16”) excess material from the bottom surface and ends of the spill containment curbing.  Make sure the bottom of the curbing and concrete floor is dry.

3. When curbs are set end to end,   installation spacers help align curbs and leaves 3/16” gap for injection of adhesive*. Use a chemical resistant grout or two-part adhesive suitable for the application to set curbing in place and seal gaps. Use a minimum 1/8” thickness to seal bottom of curbing.

4. If necessary, use a carborundum or diamond circular saw to cut curbing to required size. Always wear appropriate protection to avoid breathing dust generated from sawing. Do not attempt to score and break curbing.

5. Finish installation by filling seams and smoothing as necessary. Fill any gaps or holes to ensure a secure and clean containment area.

6. Allow a minimum of 16 - 24 hours of curing before use.
 

| Home | About Us | Local Sales Support | Contact |

© ACO USA 2007