Green Bay Titletown Podium Landscape
Green Bay, Wisconsin
This high-visibility mixed-use development for the Green Bay Packers consists of a variety of residential, office, and commercial uses that cap the Titletown development that emanates from Lambeau Field. The podium is a significant raised open space that occurs over surface parking and becomes a commons of sort for the adjacent residential and office uses.
Problem:
To collect and drain surface water from the location as quickly and efficiently as possible, the courtyard area required a 2" minimum drain depth.
ACO Solution:
- ACO Drain®
- KlassikDrain KS50 with Type 210D
- Perforated Stainless Steel Grates
ACO's KS50 drain was specified in the project design plans not only because it suited the project requirements, but also because the sleek perforated grate was visually pleasing and complimented the surrounding architecture.

-
MiniKlassik K50/KS50
- 2” internal width
- Polymer concrete channels
- Stainless/galvanized rails
- Constant depth system
- EN-1433 Load Class A–C