Euclid Waterfront
Euclid, Ohio
The Euclid, Ohio Waterfront Improvement Project is a transformational, precedent-setting erosion mitigation and public access infrastructure project that is essential for livability, economic growth and community resiliency.
Problem:
Phase 2 of the project focused on the restoration of a 3/4-mile stretch of shoreline as well as the construction of an ADA-compliant public trail. High-quality storm water drainage systems made of polymer concrete are among the critical infrastructure improvements.
ACO Solution:
- ACO Drain®
- PowerDrain® S300K
- Longitudinal Ductile Iron Grates
PowerDrain S300K was used on this job as it features an integrally cast-in ductile iron edge rail and longitudinally slotted ADA compliant grates with a load class F (90 ton) loading. PowerDrain S300K system has a 0.5% built-in slope in the channel enabling sufficient runoff to the outlet.

-
PowerDrain S300K
- 12” internal width
- Polymer concrete channels
- Ductile iron rails
- 0.5% sloped system
- EN-1433 Load Class A–F