Huron High School
Ann Arbor, Michigan
ACO Sport System 2000 was installed at Huron High School in Ann Arbor, MI to provide drainage around the track radius. The slotted system ensures effective water management while creating a smooth transition to the 'D' area, enhancing safety and performance for student athletes.
-
System 2000
- 4” internal width, 9.84” height
- 0.5” offset slot width
- Polymer concrete channels
- IAAF-certified; Olympic-grade
- Radius channel options